SAMPLES from the Home Inspection Service Manual

Table of Contents

<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

Page

INTRODUCTION

1

COMMUNICATION LOG

3

TRACKING REPORTS and CHRONOLOGICAL CHECKLISTS

100 DAY CONSTRUCTION TIMELINE      

5

85 CRITICAL EVENT COMPLETION SCHEDULE            

8

NOTICE TO BUILDER- CONCERN LETTER

10

SUBCONTRACTOR and SUPPLIER DETAIL SHEET

12

DECORATOR and COLOR SPECIFICATIONS (See Sample Below)

15

WRAP-UP INSTRUCTIONAL CHECK LIST (See Sample Below)

18

REQUEST FOR WARRANTY SERVICE

21

--CONSTRUCTION MANAGEMENT--

CONTRACTOR JOB DETAILS AND RELATED CHECKLISTS

BUILDING STAKEOUT              

23

EXCAVATION and BACKFILL      

25

CAISSON and FOOTER          

25

FOUNDATION WALL              

32

WATERPROOFING and PERIMETER DRAIN        

35

SEWER-WATER and UNDERGROUND PLUMBING       

37

INTERIOR FLATWORK                

40

FRAMING and SIDING        

43

HEATING ROUGH-IN            

52

ELECTRICAL ROUGH-IN (See Sample Below)

56

ROOFING          

58

ROUGH FRAME INSPECTION  (See Sample Below)

60 

GUTTERS and DOWNSPOUTS..

65 

GARAGE DOORS.......

67

INSULATION  

69

DRYWALL

71

MASONRY                    

76

PAINTING.........

78

INTERIOR TRIM

82

Table of Contents

<<<<<<<<<<<<<<<<<<<<<<<<<<<<<>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Page

--CONSTRUCTION MANAGEMENT-- (continued)

CONTRACTOR JOB DETAILS AND RELATED CHECKLISTS

COSMETIC FINISHES

86

   .....CERAMIC.....VINYL.....OAK.....CARPET.....MIRRORS.....APPLIANCES

MECHANICAL TRIMS...........

92

..PLUMBING..........HEATING..........ELECTRICAL

EXTERIOR

98

..FLATWORK....FINAL GRADE....LANDSCAPE...FENCE...WOOD DECK  

FINAL CLEAN

102

MUNICIPAL FINAL FRAME INSPECTION CHECK LIST

104

FINAL WALK THROUGH- QUALITY 12 PAGE CHECK LIST (See Sample Below)

107

GLOSSARY OF CONSTRUCTION TERMS ....

122

HOME CONSTRUCTION DETAILS

151

GRID Note Sheet

158


 ELECTRICAL ROUGH-IN

When the Heating and Plumbing contractor have finished, the framer should return to the home, and do his "back-out" BEFORE the electrician starts. Framing "back-out" is a term used when the framer installs all drop ceilings, soffits, fire-blocking, stair way walls, basement floating walls, chases around heat and plumbing stacks, furring strips in the garage and elsewhere, and all final framing. The framer also repairs whatever was disturbed or damaged by the heating and plumbing contractors.

Before the electrician can begin work, in most municipalities, the roof covering (shingles, etc.) must also be completed. Check with the municipality before you schedule the electrician! Some municipalities also require a licensed electrician to be on the job site and a separate electrical permit to be "pulled" . Insure this happens if it's required.

The Electrical Contractor will provide all permits, labor, materials, and electrical fixtures and components (meter housings, breaker panels, etc.) to adequately wire and trim out the home to meet all electrical inspections for the home. When the Electrician finally begins, he will normally mark the walls with switch and outlet locations according to the electrical plans you provided him. Let him know of any extras- air conditioning, whole house fans, extra telephone jacks, television outlets, etc. He'll also install the outlet and switch boxes, and may begin to "drill out" the first day. After the home is "drilled out", the electrician will then begin to "pull wire". No other contractor should be in the home when the electrician does his work. (The Plumber and Heating Contractor should be complete with their work) They may accidentally nick or burn wires. This is a big a safety hazard!

The electrician should mount the electric meter housing and service panel as soon as possible. Once this is done, the electric utility company should be called. The electric lateral should be requested to be ran from the pedestal or transformer to the home service. This can take a month or more once the utility company is notified!

(Back To "Table of Contents " Page Above)


ELECTRIC ROUGH-IN CHECK LIST

____ ELECTRIC BOXES STICK OUT OF WALL PER THICKNESS OF DRYWALL

____ CHECK PLANS AS TO LOCATIONS OF SWITCHES & LIGHT FIXTURES

____ KITCHEN APPLIANCES WIRED (Range, Hood, Disposal, Refrig., Dishwasher)

____ GAS RANGES- RUN 110 volt AND 220 volt LINE

____ COPPER WIRING USED THROUGHOUT (Range and Dryer 220v Aluminum)

____ WINDOW LIGHT RECEPTACLES ARE CENTERED ON THE WINDOWS

____ CHECK LOCATION OF TELEPHONE AND TV RECEPTACLES

____ RECEPTACLES IN THE KITCHEN NOT COVERED BY CABTS/B.SPLASH

____ NAIL PLATES ARE INSTALLED TO PROTECT WIRES IN FRAMING

____ CHECK EXTRA WIRING REQUIREMENTS (CFANS, Intercom, OPTIONS)

____ LIGHT SWITCH BOXES ARE NOT LOCATED ON HINGE SIDE OF DOORS

____ SMOKE DETECTORS INSTALLED IN EVERY BEDROOM & EVERY FLOOR

____ CARBON MONOXIDE (CO) ALARMS/DETECTORS PREWIRED

____ ELECTRIC METER HOUSING INSTALLED ON HOME & WIRES "MADE-UP"

____ WIRE DOES NOT RUN EXPOSED BENEATH JOISTS OR GARAGE CEILING

____ WIRES STAPLED SECURELY

____ CORRECT LOCATION OF DINING ROOM AND HANGING LIGHTS

____ VENTED TYPE BATH FANS INSTALLED AND WIRED

____ BATH OUTLETS NOT IN MIRROR LOCATION OR DOOR CASING

____ DOOR BELL WIRE INSTALLED THROUGH SIDING

____ CHECK TO INSURE THE DISHWASHER IS WIRED SEPARATELY

____ NO WIRES ACROSS ATTIC ACCESSES OR SKY LIGHT OPENINGS

____ ELECTRIC RAN TO RADON, FLOOR VENT FAN AND SUMP PUMP (If reqd)

____ FIREPLACE WIRING COMPLETE

____ WHIRLPOOL TUB WIRED

____ SEPARATE OUTLET IN GARAGE FOR SPRINKLER CLOCK, GARAGE OPENER

____ ELECTRIC REMOTE INSTALLED (If Electric Utility Company requires)

____ WIRE HOLES ARE FIRE-STOPPED WITH FIBERGLASS INSULATION

____ PHOTO CELL AND SECURITY WIRING INSTALLED

____ SECURITY KEY PAD AND ALARM IN CORRECT LOCATION

____ WIRE NOT RAN THROUGH COLD AIR RETURNS

____ NO EXPOSED WIRING IN GARAGE (ARMOR FLEXED)

____ BATHROOM LIGHT ABOVE THE MIRROR AT CORRECT HEIGHT

____ FLOOR OUTLETS AT BRIDGE LOCATIONS

____ WIRES NOT TOUCHING FLUE PIPES

____ GROUND WIRE SECURED TO WATER LINE AND GROUND ROD

____ A/C DISCONNECT INSTALLED WHERE CONDENSER WILL BE LOCATED

____ FURNACE IS WIRED AND READY TO LIGHT OFF

____ ATTIC AND CRAWL SPACES HAVE WALL SWITCH LIGHTING (NO KEYLESS)

(Back To "Table of Contents " Page Above)


DECORATOR and COLOR SELECTIONS ......................................................Page 2 of 3

m    mItem mm       LocationmmmmColor/Style /Number mmmmmSupplier mmPhone No.        

Counter tops

Laundry __________________________________________________________

Kitchen ___________________________________________________________

Full Bath Down ____________________________________________________

1/2 Bath __________________________________________________________

Hall Bath Up_______________________________________________________

Master Bath_______________________________________________________

Wall Ceramic

Kitchen __________________________________________________________

Full Bath Down____________________________________________________

1/2 Bath __________________________________________________________

Hall Bath Up______________________________________________________

Master Bath______________________________________________________

Interior Trim

Doors ___________________________________________________________

Base & Casing____________________________________________________

Entry Door_______________________________________________________

Crown Molding & Rail______________________________________________

Interior Door Hardware ________________________________________________

Mirrors _____________________________________________________________

Shower Doors ________________________________________________________

Medicine Cabinets ____________________________________________________

Plumbing Fixtures _____________________________________________________

Hot Water Heater _____________________________________________________

Furnace ______________________________________________________________

Air Conditioner ________________________________________________________

Ceiling Fan ___________________________________________________________

15

(Back To "Table of Contents " Page Above)

(Back To "Table of Contents " Page Above)

(Back To "Table of Contents " Page Above)

(Back To "Table of Contents " Page Above)